To: Jeffrey Epstein <jeevacation@gmail.com> Gary Kerey TE . Dour CC: Tom Sze <tom_sze@gensler.com> Schoettle Subject: Living Room Date: Mon, 25 Apr 2011 22:55:01 +0000 Attachments: Option _H2-1.PDF; Option _H2-2.PDF Jeffrey, | reviewed the layout and comments from our 4/14 conference call with Tom. Attached are two options for the living room layout. We will model this in 3D for your review, but | want to address the location before we do that. Option H2-1 is our recommended layout. e The pool has been relocated based on the survey. e The living room is centered on the pool. e There is not enough room between the living room and pool for the floating square stair, so added a stair connecting that area down to the north terraces. e To avoid having a “canyon” between the living room and office, we added a restroom below the west planter. We also added a storage room below the planter on the east side. Option H2-2 is just to show the impact of we add the floating stair. It puts the living room 8'-10' off center from the pool. Please let us know if you have a preference, and we will complete the 3d model of this area (will take about 1 day once we have a direction). Thanks, Warwick Warwick Wicksman, AIA Gensler 2500 Broadway Suite 300 Santa Monica, California 90404 USA http://www.Gensler.com Click here to view Gensler's 2010 Annual Report. EFTA00677373