Emad Hanna From: Monique Harry Sent: Thursday, October 07, 2010 2:07 PM To: Emad Hanna Subject: Hi Tech Concrete Pumping Attachments: Hi Tech req 7 - 1010.pdf Emad, Attached for payment via check Hi-Tech Concrete Pumping LLC Reg 7 in the amount of $2,115.00. Project 1010 Code 03-362. Jc ’ colo! EFTA00609134

--=PAGE_BREAK=--

Time | Mix_ Dispatchs; ___| Setup Charge (1-15) |Cubic Yards Poured Start 3. 72 |4000psi@ $16.00 Extra Pipe(s) / Hose(s) 115A 22° 50000psi@$18 00 | Transportation Finish 72.) | Grout ©$14.00° a Overtime Surcharge _ ______{Miscellaneous _ i = Total Yards a4) Total Charges Miscellaneous Additional Job Notes: Desal Szcfso dé Plaw4 Celt) General T & Conditions Contractor to provide IL? a | df lo 1, Grout to prime the pump and delivery system > Y_yS Pump able concrete mix QL | LL r Labor for setup and cleanup of delivery system LUA Suitable access onto and off of the jobsite (provide wrecker, bulldozer etc. if situation dictates) 2 | 4 5. Responsibility for any loss of delivery systems (pipes, clamps, gaskets, elbows, hoses etc.) 6. Labor to man hose. Ff Safe working conditions (operator reserves the right to cease operations should equipment or conditions prove unsafe) Terms of Payment Net Invoice is due on delivery date. Customer agrees to pay reasonable collection fees in addition to a delinquent fee of 1.5% per month if collection proceedings are initiated. “Note: Customers will be allowed ten (10) - Fifteen (15) minutes per truck (8-10 cubic yards) free unloading time after arrival of concrete truck to pump. Any delay caused by customer over this time will be charged at a rate of $75.00 per hour. Tf driver is asked to drive off main road onto private property the customer accepts full responsibility for any and all damage to any property, including but not limited to sidewalks, fences, septic tanks, power lines, phone lines etc. We do every- thing possible to provide our customers with trouble free equipment: however Hi-Tech Concrete Pumping, LLC. Will not be held Liable for any loss time, Lebor and/or materials due to any mechanical failure. The person, corporation or entity signing this contract has full and complete authority to act for and on behalf of the owner and to legally bind the owner for the performance of this contact in its entirety By signing this contract the owner, whether acting individually or through his/her/its duly authorized agent agrees to pay Hi- Tech Concrete Pumping, LLC. at the rate specified for both the hourly rate and the per cubic yard rate but in no even less than the minimum ene rate - a i. Tme 4 OPERATORS SIGNATURE I Herby certify that the above times and yardages are Hi-Tech Concrete Pumping LLC. Has completed the job to the owner/contractors satisfaction EFTA00609135