— Temporary Toilet $900.00 Temporary Enclosures/Safety $1,000.00" Material Handling $3,250. 00/ Construction Cleaning $2,600.00) : [Punch List $1,000.00) Expendables $3,000.00 | Equipment Rental $1,500.00" “Equipment Operation $3,000.00, _Misc. Expenses _ _ $5,000.00) Division Total $21,250.00 + Sitework |Layout / Survey $25.00! $2,000.00 02-200 02-211 02-281 Earthwork Rock Removal _Pest Control $25,705.00. $1,150.00 $25,705.00 $0.00. $1,150.00 _|02-411 |Foundation Drain _ $9,676.00) $9,676.00) 02-440 02-480 02-530 | 02-700 ‘Site Lighting Landscaping Concrete Paving \Piped Site Utilities $30,000.00 $10,000.00 © 02-740 jaja ao aja} a |e seas sissasiz $10,000.00 ‘Division Total Concrete [Cast i in Place Concrete = jj | | $32,170.00. $32,170.00 4000# Concrete $165.00 $28,710. 00 [Gunite $135.00 $32,400.00 ‘Slabs on Grade Vapor Barriers Ties and Accessories Rebar WwwM Saw Cuts Anchors / Inserts Admixtures |Stained Finish $5.00 $5.00! “$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 _ $0.00 $3,125. 00/” \Cistern Coatings _ ‘Pumping Curing / Protection S34 42s s4Fs44ees $3,320.00 $2,400.00. EFTA00602995

--=PAGE_BREAK=--

‘Division Total | Cees _| | Masonry | | Mortar M $0.00 CMU | i , Y $12,056.00 Stucco $4. , , $7,376.00 Division Total : | ; / |____ $116,032.00 _ | + Metals Metal Fastening Y i $0.00 Division Total a : $0.00 + Wood | | ‘Fasteners 500. : : $2,500.00 Rough Carpentry _ a , 00 $47,000.00 Finish Carpentry 000.00 - $31,000.00 Architectural Millwork i I $0.00 Division Total $80,500.00 ‘Moisture / Thermal 07-100 Waterproofing __ 07-240 EIFS 07-412 [Roofing Assembly 07-623 Copper Flashings _Downspouts 07-632 07-900 Sealants s\a/a 433 ‘Division Total : ‘Doors / Windows |_08-210 Exterior Wood Doors & Frames 08-211 ‘Interior Wood Doors & Frames 08-370 ‘Sliding Glass Doors 08-380 (Shower Door 08-710 Finish Hardware __08-810 Mirror Glass Division Total ¢8 88 /s/s Finishes 09-200 Plaster 09-300 Tile | 09-601 ‘Coral [09-910 Exterior Painting 09-920 [Interior Painting EFTA00602996

--=PAGE_BREAK=--

$0.00 $6,000.00 $1,500.00 _ Division Total $7,500.00 + Equi [Kitchen Equipment $5,250.00) — — Division Total $5,250.00 — Furnishings ) [Cabinets and Casework $11,700.00 $12,500.00 10 Granite Countertops __Division Total $24,200.00 _ Special Construction Is - $200,000.00 Division Total $200,000.00 $9,000.00 $5,000.00 |$15,000.00° Total Page 3 of 3 EFTA00602997