Wit lF[s|siu[t wit |F[s/sbalt wit [FI (Selection Mon 4/18/11 Fri 5/6/11 Site design Mon 4/18/11 Fri S611 Site drains Mon 4/18/11 Fri S611 Site lighting Shower enclosure Mon 4/18/11 Mon 4/18/11 Mon 4/18/11 Fri S611 4/22/11 Fri S611 Plumbing fixtures Mon 4/18/11 Fri S611 Electrical tixtures Mon 4/18/11 Fri Sit Fri 6/17/11 Fri Si27/11 Wed 4/27/11 Fri 6/10/tt Fri S/201t 6/17/11 Fri S611 Doors/Frames/Shutters Interior doors Fri 4/22/11 Fri S271 nn S/27/tt Root traming Fri S611 Rooting assembly Fri siaitt nm SBtt Shower enclosure Fri G/a/tt Coral tlooring Fri S/20/11 Vanity / Tops Fri S/27/11 Plumbing fixtures AC Systems Project: Procurement MainHouse 18Ap Date: Mon 4/18/11 Task Split Progress Fri G11 S/27/11 ~ Pagit7itt [aaa Milestone Summary ¢ External Tasks (sD FF SsExtermal Milestone @ | Project Summay FF _— Deadline g [May 8.11 [May 15.11 [May 22.11 [May 29.11 [Jun5.11_ dun i241 is|salt Wit |FIs|s Mit wit [Fists alt WT Fs|s balt MAT IF [s]s|M[t wit IF [stsilt wit [Fists EFTA00592281