Jaredian Design Group Actitecs, tngineers and Construction Manager 5333 Raavets Gaot, Surte 14, St. Tomas, U. S. Viacry Istavos 00802-6900 + Post Orrict Box 6218, St. Tromas, U. S. Vincer Isanos 00804-6218 Tectrnont Po E-n1 : Wisse: www. jaredian.com June 15, 2017 Mr. Jeffery Epstein Owner Nautilus, Inc 6100 Red Hook Qr., Suite B3 St. Thomas, Virgin Islands 00802 RE: Bid evaluations for maintainance, generator. and R.O. Buildings Dear Mr. Epstein, The Jaredian Deign Group is in receipt of four proposals for General construction in connection with the Maintainance, Generator, and the R.O Buildings, as designed by the Jaredian Design Group in 2015. One of the four proposals was originally submitted to you through Brice Gordon by SSVI-Expert Builders. The other three proposals were submitted by the following contractor; APEX Constructions, Balbo Construction and Custom Builders. All three of those Bidders are experienced General Contractors in the US Virgin Islands with more than 30 years’ experience each. Apex Construction has worked on such projects as Elysian Beach Resort, Eldra Schultebrandt Mental Health Facility, The VITEMA Headquarters, and many Luxury Residences, including the residence of Mr. & Mrs. Mulo Alwani. Custom Builders have completed many projects including Peace Corps / Bowsky Elementary School, Fort Christian Restoration, and the Hebrew Congregation Synagogue on ST. Thomas. The Synagogue received recognition Nationally for Historic Restoration. Balbo Construction has worked on Bertha C. Boschulte Middle School, Charles Turnbull Regional Library, Virgin Islands Public Finance Authority Offices, and many other luxury residences including the residence of the former Governor Roy L. Schneider. All three contractors have received recognition for excellence in construction. Custom Builders, as referenced before, received recognition for the Hebrew Congregation’s restoration of the Synagogue, Balbo Construction for the VI Public Finance Authority Office Building and Apex Construction for the restoration of Lieutenant Governor Office Building on St. Thomas. 1 [Bid Evaluations for Generator & R. O. Buildings on Little St. James, U. S. Virgin Iskands Jaredian Design Group | June 15, 2017 EFTA00591096

--=PAGE_BREAK=--

The bids received are as follows: Generator and R.O Buildings Maintainance Buildings Apex Construction: $ 670,267.00 Apex Construction: No Bid provided. Balbo Construction: $ 981,212.24 Balbo Construction: $ 819,478.76 Custom Builders: $1,196,147.00 Custom Builders: $1,478,8016.00 SSVI Expert Builders: $566,795.00 SSVI Expert Builders: No Bid provided. The cost of the steel structure, exterior steel siding, and doors are not included in any of the Bidder responses. Buck Steel is the manufacturer that will be providing those materials and will be delivering them to the site location on Little Saint James. The Buck Steel estimates for each site location is $126,640 for the Generator and R.O. Buildings, and $106,850.00 for the maintainance building. The Buck Steel cost for each site will be increased by $5,250.00 for stamped structure engineering drawings. The four bids received shows a wide discrepancy in cost. We believe this is a result of how each particular contractor interprets the risk involved in doing construction on Little St. James. Construction logistics are always going to be difficult on an offshore Cay. The interview that | conducted with the contractors reveals that APEX Construction and SSVI have experience working on Little St. James and Great St. James. Their experience probably contributes to the large difference between their cost and the proposals of the other two bidders. APEX Construction also indicated that they were familiar with the drawings presented to them previously, probably by Brice Gordon. The three contractors that prices were solicited from by the Jaredian Design Group, have the necessary qualifications to construct these buildings. However, we are uncertain if SSVI Expert Builders, has the necessary qualifications at this time. Therefore, we recommend that you consider the selection of APEX Construction for the Generator and R.O. Buildings. APEX Construction has informed us that they are presently completing their proposal for the Maintainance Building as they have not received the email transmitted by me earlier. However, | don't expect their cost for that building to be much different from their present proposal. The total cost of construction, including the Buck Steel Proposal for the Generator and R.O. Buildings will be $802,157.00, if APEX is selected. As the total footprint of construction is approximately 10,500 square feet, this translates into a construction unit cost of $76.40 per square foot. We find this to be a very fair and equitable cost considering the challenges faced by doing construction on Little St. James. 2 [Bid Evaluations for Generator & R. O. Buildings on Little St. James, U.S. Virgin Islands Jaredian Design Group June 15, 2017 EFTA00591097

--=PAGE_BREAK=--

Four Cost Proposals, as well as the proposals from Buck Steel, are included with this report. (enclosed) Please feel free to call us if you have any questions or comments at 340-777-1600. Sincerely, JAREDIAN DESIGN GROUP Cc-Via E-mail: Richard Kahn Daphne Wallace Leroy V. Smith 3 {Bid Evaluations for Generator & R. O. Buildings on Little St. James, U. S. Virgin Islands Jaredian Design Group June 15, 2017 EFTA00591098

--=PAGE_BREAK=--

CONSTRUCTION PROPOSAL No.1.: APEX CONSTRUCTION COMPANY, INC. EFTA00591099

--=PAGE_BREAK=--

June 9, 2017 John Woods Principal Jaredian Design Group St. Thomas, VI 00802 RE: Proposal for Generator & R.O Building Roofing Project Little St. James Dear Mr. Woods; Apex Construction Co., Inc. is pleased for the opportunity to quote you on referenced project as detailed in drawings by Jaredian Design Group dated 10/20/15. We propose to perform the work inclusive of materials, labor, equipment and supervision for the sum of Six Hundred Seventy Thousand Two Hundred and Sixty-seven Dollars ($670,267.00). Specifically excluded from this proposal is all sea transportation. Should you have any questions concerning this proposal, please do not hesitate to contact ds, 11 Hodge Vice president P.O. Box 305048, St.Thomas, U.S, Virgin Islands 00803-5048 Tc): ee 21a EFTA00591100

--=PAGE_BREAK=--

CONSTRUCTION PROPOSAL No.2.: BALBO CONSTRUCTION CORPORATION EFTA00591101

--=PAGE_BREAK=--

SR Balbo Construction Corporation “Where quality, commitment and integrity are our trademarks and building is our passion” Licensed Building Contractor General Construction. Hotels to Private Homes Phone (340) 775-7918 P.O. Box 9435 Fax (340) 714-7948 St. Thomas VI 00801 June 9, 2017 Mr. John P. Woods, Jr. Principal Jaredian Design Group P.O. Box 6218 St. Thomas, VI 00804 RE: Transmittal of BC’s Cost Proposal for - the Generator & R.O. Building and Roofing Project and the Maintenance & Workshop Building Project on Little St. James Dear Mr. Woods: Balbo Corporation is pleased to submit its Cost Proposal for the above mentioned Project. Our Cost Proposal for all work specified in the above cited RFP is a follows: One million six Hundred ninety one and one cent $1,800,691.01 We would like to thank you for affording us the opportunity to submit this proposal. Should you require further clarity or discussion relative to this proposal please contact us at the above referenced number. Sincerely, Gerard Castor, Sr. EFTA00591102

--=PAGE_BREAK=--

8/8 8| £18 Wwooy 3821035 palosdg SuUyOOY Buipjing O *y pue JoJesaUaD 00°000'0T | 00'00z'E 00'0rZ'T | 00°00S‘T 00°092'T 00°00S'6S ' 00°000'0E 00°000'E 96°€89'6 02 29008 rg ow asv'e eer ig SI) 00°008"66r a an oar ae 00°61 6p 00°0S/‘89T | 00°080'Z 00°S7z'z 00°406'9 00°000'T VIMO MMMM Mw wm wm wlan my a1Ing doysy EFTA00591103

--=PAGE_BREAK=--

JEJO] PUBIS LUSTT‘O0E O0'6TY' THT eaeDa/3 $ $ $ 00'PT6 vET $ y (vone|Rsu! pue yy8aLy sapnjouj) ss00g dr) [joy Po Rn005 215 2005 UZ au Geis 100}5 puz ROO qeIS 100)3 puz 0 805 20 105 ano eIQUIAWN Ald oui re ES s00Y UBD BuIpling aBes095 GIs OY Buypying aBesors EFTA00591104

--=PAGE_BREAK=--

CONSTRUCTION PROPOSAL No.3.: CUSTOM BUILDERS EFTA00591105

--=PAGE_BREAK=--

| r Fort Christian Renovation 2075 GENERAL CONTRACTORS ¢ CONSTRUCTION MANAGERS ~ 77H rs WT" Imitarh CHa + ms ” ne & The Eastern Caribbean A REPUTATION FOR EXCELLENCE www.custombuildersvi.com ~ EFTA00591106

--=PAGE_BREAK=--

CUSTOM BUILDERS —— a June 9, 2017 John Woods, AIA Jaredian Design Group 5333 Raadets Gade, Suite 14 St. Thomas, VI 00802 Re: Little St. James Good Day Mr. Woods: Custom Builders is pleased to present this proposal for the Little St. James Generator and RO. Roofing Project and Maintenance and Workshop Building Project. We have over thirty years of experience as a General Contractor in the Virgin Islands. Similar previous projects include the Cyril E. King Airport Baggage Claim Terminal Renovation, Cyril E. King Airport Electrical Room Expansion, and the renovation of Fort Christian. Our staff has extensive experience in commercial and residential construction through out the US Virgin Islands, and we are very familiar with the requirements, logistics, and construction techniques required for the successful completion of this project. Custom Builders’ pricing for these projects is as follows: Generator and R.O. Roofing Project: $1,196,147.00 Maint and Wi op Building Project: 14 00 Lump sum total for both projects: $2,674,963.00 Schedule: Hangar Building, 6 Months Maintenance Building, 6 Months Terms: 10% Mobilization payment upon Notice to Proceed Billing will be monthly, Schedule of values to be provided at the time of award We look forward to participating in this project and are fully prepared to respond to any questions or requests for additional information. Enclosed with this proposal, please find our cost breakdown for each project and our assumptions and exclusions. rely, Jerome Boschulte Acting President * st. [nomas * U.S. Vi EFTA00591107

--=PAGE_BREAK=--

Project: MAINTENANCE AND WORKSHOP BUILDING PROJECT DESCRIPTION BID GENERAL CONSTRUCTION ll $210,400.00 $36,401.00 $16,414.00 $538,126.00 219] $13 5 |3 AG °o a a °o 3 $163,872.00 $3,865.00 $3,309.00 $35,898.00 $111,681.00 T/M Protection Windows/Doors Finishes ecialties = olo a!" 3/81 a g & 3 2 2 \5 ts i?) ° |é s @ Ft & ° i] s 8 Conveying System Mechanical $161,489.00 $197,361.00 TOTAL BID $1,478,816.00 PROJECT DURATION (INDICATE NUMBER OF CALENDAR DAYS) EFTA00591108

--=PAGE_BREAK=--

Bid Sheet -1 May 23, 2017 Project: GENERATOR AND R.O. BUILDING DESCRIPTION BID AMOUNT GENERAL CONSTRUCTION $203,437.00 $88,028.00 8 |2/9 3/@/5 o|;=|o 18/3 S| 19 s 2 a ° a ,906.! 8 $169,359.00 $3,865.00 $84,161.00 $22,661.00 $107,875.00 Metals = aA uv 3/3 a ain $13 Finishes Specialties SHAG 3 = 5 : a Zo Fa $0.00 ecial Construction Conveying System $133,666.00 $111,189.00 TOTAL BID $1,196,147.00 PROJECT DURATION (INDICATE NUMBER OF CALENDAR DAYS) EFTA00591109

--=PAGE_BREAK=--

Assumptions/Exclusions 1. No rock excavation is included, this will be an extra. 2. We assume the existing site material will be suitable for any fill that may be required. 3. We assume that the pre-fab building will be delivered to the job site. 4. Power and water needed during the construction process will be provided to us. 5. The LSJ barge and boat will be available for transportation of materials and workers. 6. Building Permit will be provided by the owner. EFTA00591110

--=PAGE_BREAK=--

THE GOVERNMENT OF THE VIRGIN ISLANDS DEPARTMENT OF LICENSING AND CONSUMER AFFAIRS PROFESSIONAL LICENSE neat KNOW ALL BY THIS PRESENT “ " That, in accordance with the applicable provisions of Title 3 Chapter 16 and Title 27 V.LC. relating to the li businesses and jons, and compliance havit was been made with the provisions of 10V.1.C. Sec. Spey | the Civil Rights Act of the Virgin Islands, the following icense is hereby granted. Licensee: PROFESSIONAL DESIGN BUILDERS INC 4028 ANNA'S RETREAT ST THOMAS ST. THOMAS Vi 00802 4028 ANNA'S RETREAT ST THOMAS ST. THOMAS VI 00802 License No: __1.9204-18 Co. f ¢ renewal is cairod, the older is Sor making application for same Winner’ notice s ility o icensee to no Department in within w cancelled ex placed Ya inactive status. Failure to do so will result in the eaocesment of penalties as authorized law. Valid from 11/01/2016 until 10/31/2017 Printed on 11/03/2016 Issuedat St. Thomas,V.t. V\jj———5 Fee 130.00 Commissioner, Department of Licensing and Consumer Affairs THIS LICENSE MUST BE PROMINENTLY DISPLAYED AT PLACE OF BUSINESS EFTA00591111

--=PAGE_BREAK=--

i pun] aouvinsuy JUIUIUTAaAOD ‘uelpoysn> LIVaALTA S.VNNV 8ZOP | H uaatind WOLSND vad | H HTH a en NY ‘ONT ‘susan | ° nd NOISAC IVNOIssaaoua =| YDAOTdNA JO SSANAGAV 8 ANVN ff | L100 ‘Te HAAWAOTC OL LTOZ TO AAVONWE woufpouad ayy sof ODE Koyod Ky | | Pasanos $4 sakoydaua sty, forysu ayy, ‘mx Cg paysygvssa aBorsa02 aouninsus ays fo snfauag puy | : siya ay 01 paynmua st GBuspsooon ‘pun ‘epo) spurysy usb, ays fo ‘gzz uooag ‘ty sadoy) pz nip fo uorsiaoud ay3 y 310, aouvpioz9v 1 wnrmard ‘paunbas ays prod puv aouvury, (fo ssuorssrmu0l) ay? 07 woddy; s szaojduy, ayy ‘puny, zouvsnsuy quamusan05 ayy fo umpoysn) aya yum papf soy; | ‘ONI SUACTING/NDISAC TYNOISSAONd “742 2y2 2079 Gfirs29 7 aBpsaa.0) aouvinsuy quauussao5 fo avnfipsay DOINUNID LO LNDWLOVOLO Pund suvsnsuy muauusaao5 ‘unrpoisny ays fo anf{o L102 ‘OL AAVONVE ? 3370G SGNV1SI NIDYIA SALV.LS GALINA JHL JO LNSAWNYSA09 ee EFTA00591112

--=PAGE_BREAK=--

ACOR —_ CERTIFICATE OF LIABILITY INSURANCE — THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. Marshall & Sterling st. Croix 5021 Anchor Way : Sex, (340) 773-2170 Bika. oer a-sa80 | Geta re ee NSURER a certain ‘Underwriters at Llo vi 00820 Professional Design/Builders, Inc. DBA Custom Builders 4028 Anna's Retreat VI_00802-2065 " COVERAGES CERTIFICATE NUMBER-CLI711805706 REVISION NUMBER: FY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSUREO NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLoms, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Ban | aaareonyyn | SE p1230PC02491A17 7/1/2017 /1/2o18 | PERSONAL B ADV INURY _| ae Ee . Loo p/7/2016 8/2/2017 foe ee | NON-OWNED | | He Hess |__| excessuas |_| cuanssenace WORKERS DESCRIPTION OF OPERATIONS/ LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, If more space is required) General Contractor CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. ® 1988-2010 ACORD CORPORATION. All rights reserved, INSO25 (201095) 01 The ACORD name and logo are registered marks of ACORD ACORD 25 (2010/05) EFTA00591113

--=PAGE_BREAK=--

CONSTRUCTION PROPOSAL No.4.: SSVI EXPERT EXCAVATION & BUILDERS EFTA00591114

--=PAGE_BREAK=--

Generator/Mechanical & R.O. Buildings Construction Proposal ail = 8 Ex?:" cavation & Builders March 10, 2017 Prepared for: Great St. James & Little St. James Red Hook Quarters, St. Thomas, VI Contact: Brice = = Prepared by: SSVI-Expert Builders 6501 Red Hook Plaza, Ste 201 St. Thomas VI 00802 Contact: Alex RS EFTA00591115

--=PAGE_BREAK=--

SSVI is pleased to submit this construction proposal toLSJc/o Brice Gordon to be performed at the property located at Little St. James,USVI. By the signature of SSVI's authorized representative set forth below, SSVI agrees to be bound by the representations made herein. This construction proposal and the pricing provided herein shall remain valid for a period of 60 days following the date shown on page 1. 1. INTRODUCTION Little St. James desires to have the existing Generator/Mechanical & R.O buildings removed and replaced with new structures and has provided a general specification and has communicated a set of requirements, which are summarized as follows: e Site Excavation & Earthwork New Storage Building Construction e R.O Building (A) e Generator Building (B) SSVI / Expert is confident that it will present the best value forLittle St James. First, our past performance record to meet schedules and deliver a high-quality product, at a relatively low cost as compared with the competition. Second, our extensive expertise in this area allows us to tackle tough projects on a fixed-price basis, thereby alleviating any concern that the price may increase. Third, the talent level of our team is unparalleled and our project management practices ensure labor efficiencies that drive costs down. Finally, our access to the highest quality materials at highly competitive prices ensures the lowest possible cost of goods. EFTA00591116

--=PAGE_BREAK=--

2. ABOUT SSVI SSVI is an established and well-respected local contractor that has been serving customers in The Virgin Islands since 2009. SSVI has completed a broad range of construction projects over the years, and many of them have been of comparable scope and magnitude as compared with this construction project. SSVI is supported by an extraordinary team of professionals who are highly skilled in their trade. For this project, the team will be lead by Reynolds Clement. Reynolds Clement has a proven track record of successfully leading projects such as this. 3. SCOPE OF WORK SSVI will perform all construction activities associated withthe new buildings on Little St James. Such work will be carried out in accordance with requirements communicated to SSVI by Little St James in this proposal and the architectural plans provided by the Jaredian Design Group. In addition to the responsibilities of SSVI outlined in such document, SSVI will be responsible for the following: ¢ Site Excavation & Earthwork e New Storage Building Construction ¢ Construction of the R.O Building and the Generator Building e Site Cleanup EFTA00591117

--=PAGE_BREAK=--

4. SCHEDULE The entire project described in this proposal will be completed in approximately 6 months, weather permitting, following execution of a contract between the parties. 5. PRICING & PAYMENT TERMS The project will be undertaken at a price of $492,865.00 for labor and materials with the exception of the sheds and roll-up doors, which will be purchased by Little St James directly from Buck Steel who will also pav for all shiopina costs from factory to job site. Scope Of Work / Labor GENERAL REQUIREMENTS General Conditions $ 64,285 b. Shipping, Port Fees & Handling of Buck Steel order paid by LSJ SITE EXCAVATION & EARTHWORK apx 4 weeks a. . Site hand clearing and excavation . Site and foundation footing pads excavation |. Backfilling and compaction rsrereeaoge Earth change protection barricades/silt fencing Subterranean termite treatment Site retaining walls (two areas) Extended exterior walkway along R.O building A . Seeding / restoration of disturbed areas Trucking & disposal of spoils NEW STORAGE BUILDING CONSTRUCTION apx. 9 weeks T"rre me aos pw . First floor fittings & foundation walls . Enkadrain drainage matt & bituminous coating . New gravel encased 4" - PVC drain pipes First floor concrete bottom slab and entry landing . First floor exterior & interior concrete walls First floor concrete column pads and columns . First floor concrete beams . Concrete roof slab Concrete parapet wall w/ cap flashing Single-ply membrane at parapet and roof $ 63,000 $ 183,430 Price $ 64,285 2,500 1,500 1,500 3,500 1,200 $ 40,000 $ 8,500 $ 1,800 $ 2,500 Anan $ 23,400 $ 4,500 $ 2,000 $ 18,750 $ 32,000 $ 7,500 $ 15,500 $ 31,000 $ 5,250 $ 2,500 EFTA00591118

--=PAGE_BREAK=--

NEW STORAGE BUILDING CONSTRUCTION, cont. k. 6" compacted earth fill topping on roof $ 7,500 |. Doors package complete $ 3,500 m. Electrical complete (fixtures, wiring, installation) $ 20,000 n. Mecahnical exhaust fans and louvers complete $ 8,530 o. Painting of first floor walls $ 1,500 R.O. BUILDING A apx. 9 weeks $ 137,950 a. First floor excavation for pier footings $ 3,500 b. First floor spread footings and foundations $ 9,000 c. First floor concrete columns and piers $ 6,500 d. Second floor perimeter grade beams under new slab $ 8,750 e. Second floor building extended elevated concrete slab $ 28,000 f. Second floor pre-engineered building package complete Purchsed by LSJ g. Second floor pre-engineered building erection complete $ 30,000 h. Second floor roll-up doors package complete $ 15,000 i. Second floor electrical complete (Fixtures, panels and installation) $ 9,000 Jj. Second floor mechanical (exhaust fans and louvers) $ 26,200 k. Second floor miscellaneous wall painting $ 2,000 GENERATOR BUILDING B apx. 5 weeks . Second floor roll-up doors package complete . Seconf floor mechanical (exhaust fans and louvers) . Second floor miscellaneous wall painting -maoanorne TOTAL OF ALL CATEGORIES OF WORK ABOVE CONTINGENCY (15%) GRAND TOTAL Payment 1 at contract signing « 50% of stage 1Site Work Payment 2 at completion of Site Work ¢ 40 % of stage 1 Site Work ¢ 50% of stage 2 New Building Payment 3 at completion of New Building e 40% of stage 2 New Building « 50% of stage 3 R.O. Building Payment 4 at completion of R.O. Building ¢ 40 % of stage 3 R.O. Building e 50% of stage 4 Generator Building Payment 5 at completion of Generator Building « 40 % of stage 4 Generator Building Payment 6 2 weeks after completion of entire job e Balance of contract Contingency if/as required and agreed upon by both parties. $ 44,200 . Second floor electrical complete (Fixtures, panels and instalattion) $ 492,865 $ 73,930 $ 566,795 $ 31,500 $ 25,200 $ 91,715 $ 73,372 $ 68,975 $ 55,180 $ 22,100 $ 17,680 $107,143 . Second floor pre-engineered building package complete Purchased by LSJ . Second floor pre-engineered building erection complete $ 12,000 $ 12,500 $ 5,000 $ 13,800 $ 900 EFTA00591119

--=PAGE_BREAK=--

6. GENERAL TERMS & CONDITIONS 1. The above estimate is based upon standard local construction industry standards; 2. Quantities for this estimate are based upon the Owner's approved Final Design Plans; 3. Electrical and Plumbing cost estimates are based upon the standard unit cost of $125.00 per point. A point is defined as each source location where either and electrical or plumbing fixture/device provides its intended service; 4. Quantities of concrete are based upon measured amounts from the Plans; 5. The estimate includes a line item for General Requirements and Conditions which can encompass a variety of expenses which may arise during the period of construction; . All work will be done between the hours of 7:00 A.M. and 5:00 P.M. 7. ASSUMPTIONS This construction proposal and the pricing and schedule data provided herein assumes the following: 1. 3. All obligations of Little St James described herein will be carried out in a timely manner, including the obligation to make timely payment in accordance with the payment terms and schedule provided herein. . Mutually acceptable terms and conditions will be negotiated between Little St James and will supplement the terms and conditions contained herein Little St James will provide prompt feedback/answers on any questions SSVI may have and be reasonably available to SSVI in furtherance of the project 4. SSVI will be provided access to Little St James premises as reasonably required to perform the work during the working hours set forth above EFTA00591120

--=PAGE_BREAK=--

BUCK STEELPROPOSAL. EFTA00591121

--=PAGE_BREAK=--

Corporate Headquarters 6855 Lyons Technology Circle « Suite 18 ee, BUCK STEEL Toll Free Name Kenneth Benjamin Jr. Tel 3407771600 Quote Date 05/18/2015 Company Jaredian Design Group Fax Valid Through 06/02/2015 Street TBD Email fF Project ID BS15229 City TBD Sales Rep Brian Buck State ZZ Zip TBO Country US Virgin Islands Page 1of 3 Location Steet TBD City TBD County TBD State ZZ Zip TBD Country US Virgin Islands Width 4-4" Code IBC 2009 SnowGnd 0 Seismic Ss Shell Enclosed Occupancy Normal Length 61-4" Wind Load 145MPH Snow Roof 0 Seismic $1 Column Straight Thermal Unheated Height 18'4"/20'4 Exposure C Snow Is 1.0 Seismic Co Base Deluxe Formed Trim Snow Exp Sheltered 3/64" Roof Pitch .5:12 LiveLoad 20 Snowct 1.0 Frame Single Slope Reducible Yes SnowCe 1.0 Collateral 0.5 Left Endwall Spacing 2 @ 20' Type Post and Beam Bracing Cable Girt Bypass Right Endwall Spacing 2 @ 20° Type Post and Beam Bracing Cable Girt Bypass Front Sidewall Spacing 3 @ 20’ Type N/A Bracing Portal Girt Bypass Back Sidewall Spacing 3 @ 20’ Type N/A Bracing Cable Girt Bypass Roof Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Wall Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Engineering EXPORT BUILDING with final destination of Virgin Islands via PORT Everglades with unloading and freight forwarding by others. Export Notes Package includes extra sheeting, nuts, bolts, fasteners, girts and purlins with all rollup doors specifically crated for export to provide additional protection. It is the customer's responsibility to VERIFY All CODES & LOADS used to design this building as being in accordance with local requirements. Total weight is estimated as XX XXX Ibs. COD amount is to be paid in full 2 weeks prior to delivery to port 3uilding Pricing Qty Oescription 1 Base Buliding as per Engineering Specifications Included 1 Stamped Engineered Building Drawings (3 Sets) Included 1 Erecting Drawings (2 Sets) Included 1 Letter of Certification Included 1 Anchor Bolt Plans Inciuded 1 All Frames Hot Dipped Galvanized, Secondary Members Pre-Galvanized included 1 FSW 10 53/64" Below BSW Grade Included 1 FSW, BSW, REW Open to 5'-6" Included 1 Full Trim Package Including: Corner Trim, Eave Trim, Sculptured Rake Trim Included 1 Die-formed Ridge Cap Included 1 Closure Strip Package included 1 Gutters & Downspouts Included 2 Framed Opening Standard 12° x 16' For Rollup Doors Included 1 Personne! Door 3070-M White Insulated Pre-Assembled Windlock Certified w/ Lever Handle wi Threshold Included 2 Roll Up Stee! Windlock Certified Non-Insulated w/ Chainhoist 12' x 16' Included 1 Roof Insulation 6"/ R19 WMP-VR w# Starter Roll w/ Patch Tape Included 1 Wail Insulation 4"/ R13 WMP-VR w/ Starter Roll wi Patch Tape Included 1 Building & Accessory Freight To Port Everglades included 1 Export Package Including Extra Compnents and Special Crating included a Florida Website EFTA00591122

--=PAGE_BREAK=--

ee BUCK STEEL Toll Free Tel: Corporate Headquarters 6855 Lyons Technology Circle - Suite 18 Coconut Creek + FL + 33073 CUSTOMER QUOTE Name Kenneth Benjamin Jr. Tel 3407771600 Quote Date 08/18/2015 Company Jaredian Design Group Fax Valid Through 06/02/2015 Street TBD Email P| Project. 818228 Clty TBD Sales Rep Brian Buck State Zz Zip TBD Country —_US Virgin Islands Page 2of 3 t Building 2 Location Street TBD City TBD County TBD State ZZ Zip TBD Country US Virgin Islands [Engineering | Width 62 Code IBC 2008 SnowGnd 0 Seismic Ss Shell Enclosed Occupancy Normal Length 122 Wind Load 145MPH Snow Roof 0 Seismic $1 Column Tapered Thermal Unheated Height 12 Exposure C Snowls 1.0 Seismic Co Base Deluxe Formed Trim Snow Exp Sheltered Roof Pitch 1.5:12 LiveLoad 20 SnowCt 1.0 Frame Gable Symmetrical Reducible Yes SnowCe 1.0 Collateral 0.5 Left Endwall Spacing 25'/23'6"/21'6" Type Post and Beam Bracing Cable Girt Bypass Right Endwall Spacing 21'6"/23'67/25' Type Post and Beam Bracing Cable Girt Bypass Front Sidewall Spacing 21'//4@20/21' Type N/A Bracing Cable Girt Bypass Back Sidewall Spacing 21'/4@20721' Type N/A Bracing Cable Girt Bypass RoofPanel Gauge 24 Style RROL Screw Type-Length Long Life-1 1/4" Color Not Specified Wall Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Engineering Notes Building Pricing Qty Description 1 Base Building as per Engineering Specifications included 1 Stamped Engineered Building Drawings (3 Sets) Included 1 Erecting Drawings (2 Sets) Included 1 Letter of Certification Included 1 Anchor Bolt Plans Included 1 All Frames Hot-Dipped Galvanized, Secondary Members Pre-Galvanized Included 1 FSW 1’- 53/64" Below BSW Grade Included 1 LEW, BSW Open to 5'-6" For Block, REW Open to 2'-4" For Block Included 5 Misc Steel Columns To Support Roof From Below Floor(Max 30tb. per ft., Bracing At Floor W/Hdware Included 1 Mod-2 Design 40’, 20° Framelines #2-#6 Included 1 Full Trim Package Including: Comer Trim, Eave Trim, Sculptured Rake Trim Included 1 Die-formed Ridge Cap Included 1 Closure Strip Package included 1 Gutters & Downspouts Included 2 Framed Opening Standard 18° x 10° Rolling Stee! Doors Included 1 Personne! Door 3070-M White Insulated Pre-Assembled Windlock Certified w/ Lever Handle w/ Threshold Included 2 Roll Up Windlock Certified Non-Insulated w/ Chainhoist 18' x 10° Included 1 Roof Insulation 6"/ R19 WMP-VR w/ Starter Roll w/ Patch Tape Included 1 Wail Insulation 4"/ R13 WMP-VR wi Starter Roll w/ Patch Tape Included 1 Building & Accessory Freight To Port Everglades Included 1 Included Export Package Including Extra Compnents and Special Crating Total Building Website www.bucksteel.com EFTA00591123

--=PAGE_BREAK=--

Corporate Headquarters 6855 Lyons Technology Circle + Suite 18 eee BUCK STEEL Tan Free Tel Name Kenneth Benjamin Jr. Tel 3407771600 Quote Date 05/18/2015 Company Jaredian Design Group Fax Valid Through 06/02/2015 set 1 a reo sven City TBD Sales Rep Brian Buck State ZZ Zip TBO Country US Virgin Islands Page 3of 3 Project Building Pricing Qty Description 1 Base Building as per Engineering Specifications 126,640.00 Project Option Pricing (Options are NOT INCLUDED in the building price above) Description Stamped Engineered Foundation Drawings (3 Sets) Project Erecting including Equipment Rental, Unloading, and Labor(ESTIMATE) a ot IMPORTANT NOTES - PLEA * This quote is based on Buck Steel's interpretation of plans and/or conversations with the customer, Buck Steel is NOT responsible for any errors and/or ommissions. ¢ Carefully check this quote for completeness and verify the accuracy of the information contained within. * This quote is valid through 6/2/2015, and is subject to review of pricing. Revisions to quote may result in a price adjustments. Erecting is NOT included in this quote, unless specifically listed. * Anchor bolts are NOT included in this quote and are NOT provided by Buck Steel. * Concrete is NOT included in this quote and is NOT provided by Buck Stee! Buck Steel and/or the Building Engineer is NOT the “Engineer of Record". The customer/owner is responsible for any "special building inspector" or “structural engineer" required by the city or county for pre and post construction inspections. « All prices are in USD. * Pricing contained in this quote does not include any applicable sales taxes. Website Tel: www.bucksteel.com EFTA00591124

--=PAGE_BREAK=--

Corporate Headquarters Tennessee Office 6855 Lyons Technology Circle + Suite 18 1107 Battlewood Street ee , BUCK STEEL Coconut Creek + FL + 33073 Franklin + TN + ——————— Cc MER C Name Brice Gordon Tel 3407758100 Quote Date 01/31/2017 Company LSJ Employees, LLC Fax Valid Through 02/07/2017 Street 6100 Red Hook Quarter, # B3 Email Project ID BS23416 City St Thomas Sales Rep Brian Buck State zz Zip 00802 Country US Virgin Islands Pago lof 4 Project Building 1 Location Street City TBD County TBD State ZZ Zip TBD Country US) Virgin Islands Width 80° Code IBC 2008 SnowGnd 0 Seismic Ss Shell Enclosed Occupancy Normal Length 80’ Wind Load 145MPH Snow Roof 0 Seismic $1 Column Tapered Thermal Unheated Height 18 Exposure C Snow Is Base Deluxe Formed Trim Snow Exp Sheltered Roof Pitch 1.5:12 Live Load 20 Snow Ct Collateral 0.5 Frame Gable Symmetrical Reducible Yes Snow Ce Left Endwali Spacing 28’, 24’, 28° Type Full-Load Expandable Frame Bracing None Girt Flush Right Endwall Spacing 28’, 24’, 28° Type Non-Expandabie Bearing Frame Bracing Cable Girt Flush Front Sidewall Spacing 4@20’ Type N/A Bracing Cable Girt Bypass Back Sidewall Spacing 4@20' Type N/A Bracing Cable Girt Bypass Primary Frame Coating Red Oxide Primer Secondary Frame Coating Red Oxide Primer Roof Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4” Color Not Specified Wail Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Engineering EXPORT BUILDING with final destination of XXXX via PORT XXXX with unloading and freight forwarding by others. Export package includes Notes extra sheeting, nuts, boits, fasteners, girts and purlins with aif rollup doors specifically crated for export to provide additional protection. it is the customer's responsibility to VERIFY All CODES & LOADS used to design this building as being in accordance wth local requirements. Total weight is estimated as XX XXX Ibs. COD amount is to be paid in full 2 weeks prior to delivery to port Qty Description 1 Base Building as per Engineering Specifications Included 1 Stamped Engineered Building Drawings (3 Sets) included 1 Erecting Drawings (2 Sets) included 1 Letter of Certification Included 1 Anchor Bolt Plans Included 1 LEW Bay #1 Open to Building “B" Included 1 Mod-2 design, Columns at 28’ From Back Side Wall Included 1 Full Trim Package Including: Comer Trim, Eave Trim, Sculptured Rake Trim Included 1 Die-formed Ridge Cap Included 1 Closure Strip Package Included 1 Gutters & Downspouts Included 7 Framed Opening Standard Misc. Sizes For CUSTOMER Provided Louvers Included 1 Framed Opening Standard, 12' x 16", LEW, Bay #2, 5' From Column included 1 Framed Opening Standard, 12' x 16", LEW, Bay #3, 12° From Column Included 1 Framed Opening Standard, 12° x 16", REW, Bay #1, 5’ From Column Included 1 Framed Opening Standard, 12° x 16’, REW, Bay #2, 8’ From Column Included 4 Rollup Door Windiock Certified Non-Insulated w/ Chainhoist 12° x 16' Included 1 Roof & Wail Insulation 3°/ R10 WMP-VR wi Starter Roll w/ Patch Tape Included 1 Building & Accessory Freight To Port In Florida Included Florida Tennessee Website a wn uct com EFTA00591125

--=PAGE_BREAK=--

Corporate Headquarters Tennessee Office 6855 Lyons Technology Circle + Suite 18 1107 Battlewood Street es BUCK STEEL Coconut Creek * FL + 33073 Franklin + TN « 37069 Toll Free Sets CUSTOMER QUOTE Name Brice Gordon Tel 3407758100 Quote Date 01/31/2017 Company LSJ Employees, LLC Fax Valid Through 02/07/2017 Strost 6100 Red Hook Quarter, # B3 i ii Project ID BS23416 City St Thomas Sales Rep Brian Buck State Zz Zip 00802 Country US Virgin Islands Page 20f 4 City TBD County TBD State ZZ Zip TBD Country US Virgin islands Enginee Width Code IBC 2009 SnowGnd 0 Seismic Ss Shell Occupancy Normal Length 25° Wind Load 145MPH Snow Roof 0 Seismic $1 Column Tapered Thermal Unheated Height 16 Exposure C Snow Is Base Snow Exp Sheltered Roof Pitch 1.5:12 Live Load 20 Snow Ct Collateral 0.5 Frame Reducible Yes Snow Ce Left Endwall Spacing 28' Type Half-Load Non-Expandable Frame Bracing None Girt Flush Right Endwall Spacing 28' Type Half-Load Non-Expandable Frame Bracing None Girt Flush Front Sidewall Spacing 25° Type N/A Bracing None Girt Bypass Back Sidewall Spacing 25° Type N/A Bracing None Girt Bypass Primary Frame Coating Red Oxide Primer Secondary Frame Coating Red Oxide Primer RoofPanel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Wall Panei Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Engineering §REW of Building Attaches to LEW of Building “Av Notes Qty Description 1 Base Building as per Engineering Specifications Included 1 Stamped Engineered Building Drawings (3 Sets) Included 1 Erecting Drawings (2 Sets) Included 1 Letter of Certification Included 1 Anchor Bolt Plans Inctuded 1 BSW Open to 10’ for 12" Poured Concrete Wall Included 1 LEW Open To Existing Bidg Same Width, Height, Roof Pitch Included 1 Full Trim Package Including: Corner Trim, Eave Trim, Sculptured Rake Trim Included 1 Die-formed Ridge Cap Included 1 Closure Strip Package Included 1 Gutters & Downspouts Included 1 Canopy Roof Extension BSW 4' Entire Length, Sheeted 6' To Top Of Existing Wall Included 1 Framed Opening Standard 12° x 12' For Rollup Door Included 1 Framed Opening Standard Misc. For CUSTOMER Supplied Louver Included 1 Rollup Door Windlock Certified Non-Insulated w/ Chainhoist 12° x 12° Included 1 Roof & Wall Insulation 3°/ R10 WMP-VR w/ Starter Roll w/ Patch Tape Included 1 Building & Accessory Freight To Port In Florida Included Website www. bucksteel.com EFTA00591126

--=PAGE_BREAK=--

Corporate Headquarters 6855 Lyons Technology Circle + Suite 18 Coconut C: . Toll Free Tel ee BUCK STEEL Tennessee Office 1107 Battlewood Street Name Brice Gordon Tel 3407758100 Quote Date 01/31/2017 Company LSJ Employees, LLC Fax Valid Through 02/07/2017 Street 6100 Red Hook Quarter, # B3 Email PY Project ID BS23416 City St Thomas Sales Rep Brian Buck State zz Zip o0go2 Country US Virgin Islands Page Jof 4 Location Street City TBD County TBD State ZZ Zip TBD Country US Virgin Islands Width 328" Code IBC 2009 SnowGnd 0 Seismic Ss Shell Occupancy Normal Length 476" Wind Load 145MPH Snow Roof 0 Seismic S1 Column Tapered Thermal §Unheated Height 16 Exposure C Snow Is Base Snow Exp Sheltered Roof Pitch 1.5:12 LiveLoad 20 Snow Ct Collateral 0.5 Frame Reducible Yes Snow Ce Left Endwall Spacing NA Type Non-Expandable Bearing Frame Bracing Cable Girt Flush Right Endwall Spacing NA Type Non-Expandable Bearing Frame Bracing Cable Girt Flush Front Sidewall Spacing NA Type N/A Bracing Cable Girt Bypass Back Sidewall Spacing NA Type N/A Bracing Cable Girt Bypass Secondary Frame Coating Red Oxide Primer Roof Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Wail Panel Gauge 24 Style PBR Screw Type-Length Long Life-1 1/4" Color Not Specified Engineering Materials Only included to resheet customer's existing building as per architectural drawings. includes all Wall Sheeting. Primary Frame Coating Red Oxide Primer Notes Caps, Mastic, Closure Strips and Fastners. Colors to match new building colors(tbd by customer) Qty Description 1 Base Building as per Engineering Specifications 1 Die-formed Ridge Cap 1 Closure Strip Package 1 Building & Accessory Freight to Port In Florida Florida ilies Roof Sheeting, Ridge Website www. bucksteel.com EFTA00591127

--=PAGE_BREAK=--

Corporate Headquarters Tennessee Office 6855 Lyons Technology Circle « Suite 18 1107 Battlewood Street BUCK STEEL Cra BFS an Toll Free To!: an Name —_Brice Gordon Tel 3407758100 Quote Date 01/31/2017 Company LSJ Employees, LLC Fax Valid Through 02/07/2017 Street 6100 Red Hook Quarter, # B3 Eni Project ID BS23416 City St Thomas Sales Rep Brian Buck State 2Z Zip 00802 Country US Virgin Islands Page 4of4 Project Price 106,850.00 Freight Included Project Total 106,850.00 IMPORTANT NOTES - PLEASE READ This quote is based on Buck Steel's interpretation of plans and/or conversations with the customer, Buck Steel is NOT responsible for any errors and/or ommissions. Carefully check this quote for completeness and verify the accuracy of the information contained within. * This quote is valid through 2/7/2017, and is subject to review of pricing. Revisions to quote may result in a price adjustments. Erecting is NOT included in this quote, unless specifically listed. Erecting estimate is based upon, but not limited to, pad being accessible for a clear 25' around entire building, no trees, powerlines or equipment which may interfere with erecting, and power supplied to slab. Erecting estimate does not take into consideration any OSHA, Davis Bacon, special insurance requirements, or limit to days and times erecting crews are permitted to work. Accessories not provided by Buck Steel (including but not limited to: windows, doors, cupolas, vents, fans, lighting, stucco, masonry ete.) will not be installed by the erector unless otherwise specified. Anchor bolts are NOT included in this quote and are NOT provided by Buck Steel. * Concrete is NOT included in this quote and is NOT provided by Buck Stee! * Buck Steel and/or the Building Engineer is NOT the "Engineer of Record". The customer/owner is responsible for any “special building inspector" or "structural engineer" required by the city or county for pre and post construction inspections. ¢ All prices are in USD. Sales tax is NOT included in this quote. Questions about this quote? Contact Brian Buck at (866) 574-2826 Ext.114 Florida Tennessee Website a wm cae EFTA00591128