MEMORANDUM FO the amount of There were The surveys ition that have This is a request to establish a B&F project i 0,000.00, in order for a contractor to remov multiple surveys done dating back from 2009 have identified mult I le areas throughout the EFTA00142448

--=PAGE_BREAK=--

FAC 2.6 - Independent Government Estimate (IGE) Date ——siv/av/20u.— <sC~C‘“‘;S™C*diRequest’ inti = linstitution {MCC New York General Improvements Project Title |Asbestos Removal Object Class Category 25 (Contract) General Requirements = 8 I 3 Cc z a & e Wi 7 Thermal & Moisture Protection o a. Insulation i=) 8 = e 5 A TTHTI WITATBEHHII| 8 8 8 8 8 3 4 8 Finishes ‘ cs = 5 a 7 y 2 fronting 3 a e z c 2 3 5 ood & Plast Conveying Systems Primary . Secondary oo = < > oO ee ene TOTALS: , Grand Total: a g $100,000.00 EFTA00142449

--=PAGE_BREAK=--

FAC 2.5 - Schedule of Cost Input (SCI) Date __AvRO9 Request [intl SSCS insttation [MCC NewYork |eategory ___[Generalimprovements SS fobjectciass dost] x00 [rosfwn] $1000 _[Poslwr] $x1000_| fina FulTime Permanent +t '‘i{| it | | it [it] _ fis Other Personal Compensation | ||| ||| | |_| 12.1 Personal Benefits: Cuilan | 1.0 Travel and Transportation of Persons Tepe NINTN N ° = = a 8 a ov 4 6 3 i= 4 z =] CA +d 3.2 Rental Payments to Others S w i 3 2 3 g 8 § 2 2 a = s 2 5 g 2 3 1.0 Minor Equipment o o]olIco Pld le HEE PaRats 3 Total in Dollars $100,000.00 There are muliple areas within the institution that has been identified by NYS cerified contractor which contains abestos. The asbestos files are unintentintally breaking and seperating from the floor in both inmate and vistor ares. Current Conditions MCC New York proposes to hire a contractor to remove all asbestos identified in past and present surverys. The contractor will also inspect, clean, abate, and dispose of all asbestos contained therein. The abatement contractor shall certify that the Institution complies with OSHA and HUD requirements for asbestos thresholds. a. MCC New York, 150 Park Row, NY b.N/A c.N/A d.N/A e.N/A f. RS MEANS g. CONTRACTOR h. General Requirements (60,000.00), Thermal/Moisture Protection (10,000.00), Finishes (10,000.00), Specialties (20,000.00). iN/A j. This project will comply with all FROP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-ABA and Federal, State, and Local codes and regulations as applicable to this project. j. Compliance has been addressed as applicable to this project, inclusive of FBOP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA- ABA, and Federal, State, and Local codes and regulations. k.N/A FBOP Technical Design Guidelines, seismic zone requirements, environmental compliance, Life Safety, NFPA, ADA-ABA, and Federal, State, and Local codes and regulations have been reviewed or if A&E services are required must all be addressed in the proposal section of this justification. Page 1 EFTA00142450