UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG Shift-Day-Date: M/W Saturday, July 20, 2019 Beginning Count: 780 | SHU: 71/5 Daily Sensitive Information: M/W I/M Burnett #76254-054 at Local Hospice w/USMS Guards __ercnrostca avers —SSCS~—SCS 12:00 AM| Lieutenant [RRRRMMJ assumes duties as the Morning Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. PREA announcement conducted via the Institution Public Address System and/or Radio. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate/Facilities/R&D. Roof Check completed. All secure. Temporary Chit Inventory: #1:2; #2:5; #3:5; #4:6; #5:5; #6:0; Hosp:0 12:00] Institution Count in progress AM 12:00 |NYPD Phone Check #1493 12:11] Body Alarm testing in progress 12:25] Body alarm testing completed 12:30|Watch Calls cont. : Good Verbal count announced : Clear Institution count announced 780 Outside caller notified Control Center of planned fight on 11 South this morning. Captain Notified. Unit to remain Lockdown until further notice. : Relieved of duties by Lt. [RRRRENNJ as D/W Operations Lieutenant 780 STG International Terrorist phone calls monitored: WITSEC inquiry(s) was/were received during my tour of duty: The following Inmate(s) were placed in Administrative Detention: Ending Count: 780 SHU: 71; 10-South: 05; SHU OBS: 00; Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00 Zz 1°] 8 ie] : cee : Dl WlO;M|/Nm}/o So] al o]w}]sa}o ce CONFIDENTIAL SDNY_00012047 EFTA00139819

--=PAGE_BREAK=--

UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG SHIFT-DAY-DATE: D/W — Saturday, July 20, 2019 Beginning Count: 780 SHU:71/5 Daily Sensitive Information: I/M Burnett #76254-054 at Gold crest nursing facility w/USMS Guards. Lieutenant assumes duties as the Day Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:5; #3:5; #4:6; #5:6; #6:5; Hosp:0 Daily Hand Stamp :BJBE/RIGHT HAND NYPD Phone Check #1847. NOTE: Staff informed the Lieutenants office that NYPD, counter terrorism and HSI will be occupying the Saint Andrews place/Center street as well as the outside of the institution. All civilian foot traffic in those areas will be prohibited. All civilians will have to use alternate routes. Outside caller notified Control Center of planned fight on 11- South this morning. Captain Notified. Unit to remain Lockdown until further notice. 8:09 AM| Body Alarm Test Initiated. 10:00 AM/ Institutional count in progress. 10735 AM 11:05 AM| NOTE: Unit 11-South will be allowed to use the computers and telephones for one hour at a time tier by tier as per the Captain. 3:45 PM| Institutional lockdown for count. 4:00 PM| Relieved of duties by Lt. [EJ as £/w operations Lieutenant. Visitation: 5 South eee ene I ( ( ION SCANNING TESTED HITS: 0 STG/High Alert phone calls monitored: 32 WITSEC inquiry(s) was/were received during my tour of duty: 0 The following Inmate(s) were placed in Administrative Detention: 0 TS wemeTRes Niner [Reason Unte | IN| A/D Order Ending Count:780 ; SHU: 71; 10-South: 05; SHU OBS: 00; Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00 CONFIDENTIAL SDNY_00012048 EFTA00139820 +

--=PAGE_BREAK=--

UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG SHIFT-DAY-DATE: E/W - Saturday, July 20, 2019 | Beginning Count: 780 SHO 73/ Daily Sensitive Information. I/M Burnett #76254-054 at Goldcrest nursing facility w/USMS P| Guards. Lieutenant assumes duties as the Evening Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. Unable to conduct PREA announcement over the 4:00 PM Institution Public Address System, due to, system malfunction. 780] 71/5 Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:0; #3:0; #4:0; #5:1; #6:0; [FOO P| institution count in progress. TY [4:00 BN[WYPD Phone Check 908. OSC |. [#10 eH | Body Alarm testing in progress. SSOSC~—SCSCSSCSdSSC*d [4:28 P| Body alarm testing completed. SSCS dT *d [5:00 PN Good verbal announced SSCS YY | Cd [5:02 PH| Clear institutional counts SSCS YY | [s:00 PN[Watch call in progress SSOSCSCSCSCSCSCCCCCC | [er00 PN[trash run commenced. SCC YY | [Sis PN[ trash run complete. SSCS C“‘’~*iY| +d 10:00 Institutional count in progress. PM 10:26 | Good verbal count announced. PM 10: 2 Clear institutional count announced. 71/5 12: 30 Continues duties as M/W Lieutenant. 71/5 VISITING: CANCELLED Tres ee STG/High Alert phone calls monitored: 13 WITSEC inquiry(s) was/were received during my tour of duty: 0 The a Inmate(s) were Placed in Administrative Detention: 0 REG NUMBER REASON UNIT TIME A/D ORDER Ending Count:780 ; SHU: 71; 10-South: 05; SHU OBS: 00; Act. Lt. — Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00; B/A SHU: 00 CONFIDENTIAL SDNY_00012049 EFTA00139821