UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG Shift-Day-Date: M/W Tuesday, July 23, 2019 Beginning Count: 776 | SHU: 74/5 Daily Sensitive Information: M/W | 1/\ at sLocal Hospice w/USMS Guards ee 12:00 AM| Lieutenant [RRRRRMJ assumes duties as the Morning Watch|776 | 74/5 Operations Lieutenant. The fire alarm and sprinkler system are nonoperational. Fire Watch in progress. PREA announcement conducted via the Institution Public Address System and/or Radio. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate/Facilities/R&D. Roof Check completed. All secure. Temporary Chit Inventory: #1:2; #2:5; #3:5; #4:6; #5:5; #6:0; Hosp:0 Note: |Control panel inoperative for ES/GS Main Door/Fire Exit doors. Inner Gate inop. 12:00] Institution Count in progress 12:00|NYPD Phone Check #1626 12:18] Body Alarm testing in progress 3| Body Alarm testing completed 12:30|Watch Calls/Fire Watch cont. :50]| Good Verbal count announced AM 12:54]Clear Institution count announced Call for Assistance 9-South Call for Assistance secured -1 SHU: Epstein #76318-054 to Suicide Watch w/inst. staff. Medical, Captain notified. Duty Psych (left message) 7 8:00 Relieved of duties by Lt. [ERRREJ as D/W Operations Lieutenant 77 STG International Terrorist phone calls monitored: WITSEC inquiry(s) was/were received during my tour of duty: The following Inmate(s) were placed in Administrative Detention: F AM 12: AM 3 f Rr eR Ww] wih cojij zm oy On) Ga] Wa} lo WOOT a} w)o See z 73/5 73/5 ~! ~ ~ ~~) ~) fea) °° oO ~ ~ ~ Ww Ww Co ~ ~ ~ uw uw wo oO CONFIDENTIAL SDNY_00012112 EFTA00034706

--=PAGE_BREAK=--

STA Ending Count: 776 SHU: 73; 10-South: 05; SHU OBS: 00; Local Hosp: 01; H/A OBS: 01; B/A OBS: 00; Dry Cell: 00 SHIFT-DAY-DATE: D/W - Tuesday, July 23, 2019 Beginning Count: 776 SHU: 73/5 D /W Daily Sensitive Information: I/M Saat Gold crest nursing facility w/USMS Guards. Lieutenant QJ assumes duties as the Day Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable at this time. Fire Watch is in Progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:5; #3:5; #4:6; #5:6; #6:5; Hosp:0 Daily Hand Stamp : GPKJ/RIGHT HAND CONFIDENTIAL SDNY_00012113 EFTA00034707

--=PAGE_BREAK=--

UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG 8:00 AM| NYPD Phone Check #1794. 8:17 AM| Body Alarm Test Initiated. 8:30 AM| AM Census Conducted 12:30 PM| PM Census Conducted 12:35 PM| I/M out to Court 1:00 PM 1) iii out to L-Hosp I/\ return from L-Hosp. | Institutional lockdown for count. Relieved of duties by Lt. as E/W Operations Lieutenant. Visitation: 11 South Inmates Adults Children ION SCANNING TESTED HITS: 0 STG/High Alert phone calls monitored: 5 WITSEC inquiry(s) was/were received during my tour of duty: 0 The following Inmate(s) were placed in Administrative Detention: 0 Ending Count:773 ; SHU: 73; 10-South: 05; SHU OBS: 00; Local Hosp: 01; H/A OBS: 00; B/A OBS: 00; Dry Cell: 00 CONFIDENTIAL SDNY_00012114 EFTA00034708

--=PAGE_BREAK=--

UNITED STATES DEPARTMENT OF JUSTICE METROPOLITAN CORRECTIONAL CENTER, NEW YORK, NY DAILY LIEUTENANT’S LOG SHIFT-DAY-DATE: E/W - day, July 22, 2019 Beginning Count: 776 SHO: 73/ TIME 4:00 PM 4:00 PM 4:03 PM 4:18 PM 4:37 PM 5:00 PM 4:53 PM 4:59 PM 6:00 PM 10:00 g tH ~S PM 10:43 Daily Sensitive Information. I/M Soa Goldcrest nursing facility w/USMS Guards P| I/M Epstein #76318-054 on Suicide Watch. w/inmate companion Lieutenant assumes duties as the Evening Watch Operations Lieutenant. The fire alarm and sprinkler system are inoperable Fire Watch is in progress. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conducted. All operative w/the exception of Rear Gate. Roof Check completed. All secure. Temporary Chit Inventory: #1:0; #2:0; #3:0; #4:0; #5:1; #620; Institution count in progress. NYPD Phone Check #1741 Body Alarm testing in progress. Body alarm testing completed The fire alarm and sprinkler sys > inoperable at this Fire Watch in Progress until rther no e. | Institutional count in progress. | [| 8 Good verbal count announced. | | | PM 10:50 12:00 Clear institutional count announced. 68/5 Relieved of duties by RJ M/w Lieutenant. 68/5 VISITING: 11 SOUTH nore ee ee a 34 STG/High Alert phone calls monitored: 13 WITSEC inquiry(s) was/were received during my tour of duty: 0 The following Inmate(s) were placed in Administrative Detention: 0 me | omnmen | nanson | unis |_sinm | ‘A/D ono Ops. Lt. Act. Lt. | Ending Count:776 ; SHU: 68; 10-South: 05; SHU OBS: 00; | sid Local Hosp: 01; H/A OBS: 01; B/A OBS: 00; Dry Cell: 00; B/A SHU: 00 CONFIDENTIAL SDNY_00012115 EFTA00034709